Commercial & Industrial Energy Storage Solutions (C&I BESS)

DJENERGY delivers all-in-one air-cooled commercial & industrial energy storage solutions for PV + grid + diesel hybrid sites. Use BESS for peak shaving, TOU shifting, backup power and zero export compliance. Modular cabinets support parallel expansion and fast commissioning.

Commercial & Industrial BESS

Designed for peak shaving, TOU shifting, PV self-consumption and backup power for C&I sites.

  • Factories, warehouses, and industrial parks
  • Commercial buildings, malls, and data/telecom facilities
  • Sites with high demand charges or TOU tariffs
  • Scheduled charging/discharging (TOU arbitrage)
  • Peak shaving / demand limiting
  • Backup mode with seamless transfer (with STS/ATS)
  • Works with existing PV inverters (AC-coupled)
  • Supports common LV standards (400V 50Hz / selected 480V 60Hz)
  • Commissioning checklist and documentation set available

Off-Grid Hybrid (PV + DG + BESS)

Stable power for remote sites—maximize PV usage and reduce diesel fuel consumption.

  • Remote factories, mining, oil & gas camps
  • Islands and rural communities
  • Construction sites and temporary power
  • PV priority + battery buffering
  • Generator start/stop logic based on SOC and load
  • Load management for critical vs non-critical circuits
  • AC-coupled architecture supported (PV inverter + PCS)
  • Can coordinate with diesel genset controller (start/stop, limits)
  • Recommend site load profile and generator rating for sizing
Off-grid hybrid PV diesel BESS architecture

Zero Export Control

Meter-based export limiting to keep export at 0 kW while maximizing self-consumption.

  • Sites with “no feed-in” policies or limited export contracts
  • Commercial facilities adding PV without grid upgrade
  • Industrial users needing strict export compliance
  • Real-time power control based on grid meter readings
  • Export cap = 0 kW (or configurable limit if allowed)
  • PV + BESS coordination to absorb surplus generation
  • Requires CT/meter at point of common coupling (PCC)
  • Works with AC-coupled PV; control logic managed by PCS/EMS
  • Recommend single-line diagram review before installation

Microgrid Solution

Coordinate PV, storage, and generators with centralized control for stable and efficient operation.

  • Campuses, industrial parks, and island grids
  • Community power systems and utility-supported microgrids
  • Critical infrastructure with high uptime requirements
  • Priority dispatch rules (PV-first / cost-first / reliability-first)
  • Frequency/voltage support (project-dependent)
  • Black-start / system restoration logic (if required)
  • Recommend a site-level EMS for multi-unit coordination
  • Grid-forming capability depends on PCS configuration (project-based)
  • Provide interface list for SCADA / BMS / meters as needed
liquid-cooled BESS project 500kW 1MWh

Sichuan • Liquid-Cooled BESS

500 kW / 1 MWh

Microgrid architecture PV BESS diesel generators EMS

Malaysia • Liquid-Cooled BESS

30 MW / 60 MWh

air-cooled commercial industrial BESS project 800kW 1.6MWh

Hebei • Air-Cooled BESS

800 kW / 1.6 MWh

off-grid hybrid PV diesel BESS architecture diagram

Jiangsu • Air-Cooled BESS

300 kW / 690 kWh

Why DJENERGY

Engineered for C&I sites—PV-ready, scalable in parallel, and compliance-focused for real-world operation.

PV-Ready Integration

Supports PV inverters (AC-coupled typical), grid connection, and diesel hybrid operation.

Parallel Expansion

Scale power and capacity by adding units in parallel as loads grow.

Fast Commissioning

All-in-one design simplifies installation, wiring, and on-site commissioning.

Protection

Multi-level protection with BMS/EMS coordination, alarms, and safe logic.

EMS Monitoring

EMS-ready monitoring for status, alarms, data logging, and remote support.

Grid Compliance

Meter-based export limiting ensures compliance with strict grid rules.

Get a System Proposal (Typically within 24 Hours)

Share your load profile and site details.
We will recommend a cabinet configuration and one-line architecture.
Email or WhatsApp for the fastest response.

FAQ

What size C&I BESS do I need for peak shaving? + -

Provide peak demand (kW), target reduction (kW), and duration (hours). We size power (kW) for demand control and energy (kWh) for runtime.

Can your system work with PV + grid + diesel together? + -

Yes. Our EMS supports PV priority, grid interaction, and diesel coordination for hybrid and weak-grid sites.

Do you support zero export / export limiting? + -

es. Meter/CT feedback enables 0 kW export or a configurable export cap through EMS/PCS real-time control.

Is AC-coupled PV supported? + -

Yes. AC-coupled PV integration is commonly used for retrofits and hybrid applications.

Can I expand later? + -

Yes. Systems support parallel expansion to increase kW/kWh as loads grow.

What information do you need for a quotation? + -

Grid voltage/frequency, PV size, load profile, target application (peak shaving/backup/zero export), and installation environment.